Zigong West Water Plant

Created on 2025.03.14
Project Name: The First Batch of Equipment Projects of Zigong West Water Plant
Project Water Quality: Tap water
Project Scale: 250,000 tons per day
Equipment Name: PAC Dosing Equipment, Sodium Hydroxide Dosing Equipment, Sulfate Dosing Equipment, Hydrogen Peroxide Dosing Equipment, Powder Activated Carbon Dosing Equipment
Zigong West Waterworks is a key project in Zigong City's three-year water supply security action plan. After it started operation in 2021, it supplies high-quality tap water through the city's pipe network. This further solves the contradiction between the urban domestic and production water supply in Zigong City, alleviates the bottleneck of water supply during peak periods, and provides sufficient water resource elements for Zigong's integration into the Chengdu-Chongqing Twin-City Economic Circle.
With the acceleration of the urbanization process, abnormal water sources caused by human production and life occur frequently. The West Water Plant is equipped with a number of emergency dosing equipment, which can timely address potential water quality problems.
0

Contact Us

Have any question or feedback, feel free to reach out to us. We are always available to help.

Home

Feature product

Brand Story

Copyright @ 2022, NetEase Zhuyou(and its affiliates as applicable). All Rights Reserved.

Products

ALL products

Partner Program

About Us

why Us

our expert team

FAQ

Contact us

Map

Shipping

News

Company News

Subscribe

Subscribe to our newsletter and be among the first to hear about new arrivals, events and special offers.